Sorting and packaging centre
The sorting and packaging center was inaugurated in 2015. Located on a plot of 104,213 m2 and with a total constructed area of 14,800.45 m2, there is a Handling center 1 main warehouse of 9,535, 55 m2 and an office building of 1,186.20 m2. The Handling center 2 has supply, storage and the watermelon handling area of 4,042.80 m2.
We also have a Canteen that serves members and employees. We have made an investment of more than 11 million euros in these facilities as well as in the machinery lines that incorporate the latest technology. They are facilities designed with care and a lot of love, both by the technicians and by the president, plus all those personnel and companies who contributed all their extensive knowledge and during construction.
The well-being of our workers
The well-being of workers is the main objective of our company, and therefore these facilities have focused on making workers comfortable by offering the best possible working conditions: thermal, health and lighting.
Making the most of natural light and creating a friendly and comfortable workspace, workers themselves feel more comfortable and that ultimately favors their moods and performance. Being a company of organic products, mainly tomato, many of our processes cannot be automated, so we have a team of more than 300 workers at our headquarters.
Energy Efficiency
In line with our ecological philosophy, we intend that these facilities are in accordance with our respect for natural resources, a building designed to be as sustainable and efficient as possible.
We emphasized and studied in depth the different construction solutions in the envelope of the warehouse, opting in the end for ventilated façade solutions, plus insulating panel covering with false ceiling to create an air chamber that works much better thermally along with multi-cell polycarbonate skylights, etc.
Hygienic and Sanitary Interior Finish
When handling food, we consider it essential to take care of the interior finish. A pristine atmosphere was sought, free of visible installations and loose elements to avoid the accumulation of dirt and dust, with totally smooth walls and a pore sealant treatment in the screed to prevent dirt from embedding.